WKR1 Work Ranch creepmeter Has "CalTech" style electronics Note that archive have data only from 1977 forward 2004 Parkfield (Sept 28) 'pegged' the creepmeter; loosen wire at creepmeter and let 29 mm of wire slide to get a micrometer measurement of 22.4mm For the field visits on Nov 15 2004 and Jan 3, 2005, noted that the voltage to the transducer (a potentiometer) was 110 mv; it should be 100mv but was not adjusted. Prior field visits had measured voltages at approximately 100 mv (+/- 1 mv); Consequently, I adjusted the scale factor by 0.909 for data between Nov 1, 2004 and Feb 1 2005; This better reconciled the telemetried data and the micrometer measurements. Hopefully, the next field visit will include adjusting the voltage to the transducer. November 2006; DCP was swapped out for new one; electronics remain the same as output is 0 to 1 volt. Scale factor change of ratio 1000/409.6 Scale factor is now 271 counts(mv) per mm fault slip (creep). N 201403090000 Potentiometer reset (AS) N 201403090350 Ditto N 201403080540 Ditto N 201403080750 Ditto N 201403080810 Ditto N 201403081030 Ditto N 201406151945 ditto (JOL) N 201406192340 Potentiometer reset (AS) S N 201411040720 Potentiometer reset (AS) N 201411041220 Potentiometer reset (JOL) S N 201411051140 Potentiometer reset (AS) N 201411051210 Potentiometer reset (AS) S N 201411051250 Potentiometer reset (AS) N 2014j3100420 continued Potentiometer reset (JOL) N 201501290400 Potentiometer reset (AS) N 201501291930 Ditto S N 201505131920 Wire reset (AS) S N 201505131930 Wire reset (AS) N 201505131940 Ditto N 201602181630 Potentiometer reset (JOL) N 201602190445 ditto N 201606142040 Potentiometer reset (AS) N 201606161930 Ditto cont'd (AS) N 2016j3390140 Potentiometer reset (JOL) N 2016j3400210 ditto -- cont'd S N 201701190220 Potentimeter reset (AS) S N 201701190230 Ditto N 2017j0190240 Potentiomenter reset (JOL) S N 201701190250 Ditto (AS) S N 201701190300 Ditto S N 201701190320 Ditto S N 201701190330 Ditto S N 2017j0190340 Ditto S N 2017j0191130 Ditto N 2018j0810520 Potentiometer reset (JOL) N 2018j0810730 ditto N 2018j1161830 Potentiometer reset (TLE) N 201903051855 ditto (JOL) N 201903071855 ditto (JOL) N 2019j2192240 "" N 2019j2211930 "" N 2019j3381600 Potentiometer reset (JOL) N 2020j0400320 ditto (JOL) N 2020j0410840 ditto N 2020j2061930 Potentiometer reset (TLE) N 2020j2072320 ditto N 2020j3250610 Potentiometer resest (JOL) N 2020j3271030 ditto N 2021j0741200 potentiometer reset (JOL) N 2021j0750530 ditto N 2021j1672100 field reset/rezero N 2021j2081810 Potentiometer reset (JOL) N 2021j2092040 ditto N 2021j3031150 ditto (JOL) N 2021j3051055 ditto (JOL) N 2022j0062330 "" N 2022j0071020 "" N 2022j3610820 "" N 2022j3612020 "" N 2024j0041430 "" N 2024j0050640 "" Many of the above offsets are due to a dead portion of the potentiometer; there will be a pair of offset separated by about 1-day. For more information, please consult: Open-File Report 2024-1011, “Summary of Creepmeter Data from 1980 to 2020—Measurements Spanning the Hayward, Calaveras, and San Andreas Faults in Northern and Central California” https://pubs.usgs.gov/publication/ofr20241011 and Open File Report 89–650, "Catalog of creepmeter measurements in California from 1966 through 1988" https://pubs.usgs.gov/publication/ofr89650 Many people have contributed to this project including: Roger Bilham Robert Burford Sandy Schulz Andy Snyder Kate Breckinridge Todd Erickson Rich Liechti Vince Keller John Langbein For questions, contact John Langbein (langbein@usgs.gov)